Beacon Offshore Energy’s third development well at Claiborne field in the Gulf of Mexico was deemed a success after reaching total depth, partner Talos Energy reported. Located on Mississippi Canyon block 794 in 1,500 ft of water, the MC 794 #3 well logged 284 ft of true vertical pay across five pay sands, which exceeded pre-drill expectations. The well will be tied back to the Walter Oil & Gas-operated Coelacanth production facility in Ewing......
Provide your credentials to access this page
Member Area: Log in if you have a PLS web account or Sign up for internet access now.