Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Exall Energy Corp
|
August 2010 Corporate Presentation
| Roger N Dueck | Page 7 of 11 |
April 29, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"August 2010 Corporate Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
Marten Mountain, Mitsue, AB ? Operated WI 66% to 72% (14-1 is 60% BPO) ? Pipeline and Battery Facilities completed in Dec 2009 ? Full Waterflood and GPP Approval granted Q1 2010 ? Prod 1500 BOPD (950 net) 40° API sweet oil in Feb 2010 –new well adds 600 BOPD (420 net) capacity ? 10-12 recovered oil and gas – damaged and requires Lesser Slave Lake Provincial Park 10-12 Offset locations New Surface Location stimulation planned for summer 2010 ? 12-25 - two sands - tested at 624 BOPD and 148 MCFPD over final 24 hrs (net 466 BOEPD) Existing Surface Location ? New lands acquired in January 2010 ? Excellent land position – 8800 acres (6,150 net) 13-30 Location Offset locations ? Four ‘B’ sand wells planned this summer ? Two ‘A’ Channel locations in winter of 2010 -11 ? New wells have less “reach” lower cost Exall Ro a 12-25 B Discovery 7 © 2010 – Exall Energy Corporation. All Rights Reserved a d/PL