Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Perpetual Energy Inc
|
March 2024 Corporate Presentation
| Susan Riddell Rose | Page 8 of 11 |
May 09, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"March 2024 Corporate Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
McDaniel YE 2023 TPP Type Curve Economics Price Deck 3 Consultant Pricing January 1, 2024 2024 Pricing $2.09/GJ (AECO); $66.96/bbl NGL Capital (D,C & T) $6.52 MM Depth / Lateral Length 2,430 m TVD/ 2,400 – 2,700 m Type Curve IP 6.8 – 9.7 MMcf/d 1 year exit rate 2.2 - 2.5 MMcf/d 17.4 bbl/MMcf NGL (59% condy) 2P Reserves 5.4 – 6.5 Bcfe per well Operating Costs $3.10/boe (first year) NPV @ 10 % $5.3 – 8.1 MM gross ROR 78% - 134 % F&D $6.24 - $7.35/boe Capital Efficiency $9,120 - $10,190 boe/d Payout / Recycle Ratio 0.9 - 1.2 Years / 4.3 – 3.4 To Rosevear West Wolf 10-3 East Edson • Wilrich primary development ? 30 (13.7 net) PPUD locations ? 2 (1.0 net) unbooked Wilrich locations • Q4 2023 production: ~5,025 boe/d ? 27 MMcf/d net gas ? 520 bbl/d net NGL (59% C5+) • Processing Capacity: 78 MMcf/d gross (39.0 net) MMcf/d ? West Wolf: 65 (32.5 net) MMcf/d ? Rosevear: 13 (6.5 net) MMcf/d • Secondary zone potential ? 1 PNP Notikewin onstream Jan 2023 ? Cardium, 2nd White Specks, Viking, Notikewin, Fahler, Gething & Rock Creek secondary potential ? Low cost, liquids-rich conventional natural gas, multi-zone property with owned infrastructure ? 50% non-operated interest with best-in-class operator (Tourmaline Oil Corp (TOU-TSX)) ? 2023 – Drilled & Completed 6 gross (3.0 net) wells • Wilrich drilling inventory forecast to sustain production at infrastructure capacity through 2029 • Continue drilling to maintain ‘full capacity’ through the existing infrastructure and harvest property-level free funds flow ? Secondary Zone potential in multiple proven horizons • Resource in Cardium, Viking, Notikewin, Fahler, Rock Creek, Gething and Second White Specks zones proven in vertical producers • Reserve additions from first Notikewin horizontal drilled in Q4 2022 – Monitoring production & higher liquid yield performance ? Optimizing facilities and evaluating technologies to drive ESG excellence • Vapor recovery unit installed in 2022 to reduce emissions and increase NGL sales • Condensate separator at 16-10 compressor site installed to enhance yields • Header modifications/inactive pipeline reactivations ongoing to allow separate low and high pressure lines • West Wolf Lake Plant is host to the Natural Gas Innovation Fund’s Emissions Testing Center for new technology field trials Asset Summary – West Central Alberta East Edson Liquids-Rich Gas Refer to Slide Notes and Advisories Wilrich PUD (18 gross) Wilrich PAUD (12 gross) Wilrich Inventory (2 gross) WI in Wilrich PNG Rights