Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
88 Energy Ltd
|
April 2024 Investor Presentation
| David Wall | Page 5 of 11 |
May 02, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"April 2024 Investor Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
INDEPENDENT CONTINGENT RESOURCE DECLARATION Targeting Upper and Lower SFS reservoirs and SMD-B reservoir, to be completed 2H 2024. MULTIPLE COMMERCIALISATION PATHWAYS SMD-B RESERVOIR SMD-B delivered peak flow rate of ~50 bopd of light oil (measuring approximately 39-degree API oil gravity) 1 CONFIRMED DISCOVERIES POST FLOW TEST ACTIVITIES COMMERCIALISATION FARM OUT AHEAD OF FUTURE DEVELOPMENT Numerous production analogues demonstrate successful horizontal well development potential POST TEST STUDIES For refined development planning for all reservoirs, with pre-FEED studies to commence 2H 2024 BFF RESERVOIR Gross Best Estimate Independent Contingent Resource 250 MMBOE 3 NATURAL GAS LIQUIDS (NGLs) Fluid characterisation (as part of post-test studies) to potentially determine estimation of NGLs for additional value levers UPPER AND LOWER SFS RESERVOIRS Upper SFS delivered peak gauge flow rate of over 70 bopd of light oil (measuring approximately 40-degree API oil gravity) 2 CAPITAL-LIGHT PRODUCTION OPTION TO ADVANCE EARLY PRODUCTION Facilitated by location, with proximate infrastructure advantages allowing for modular and scalable early production system 1. Refer to the ASX release dated 15 April 2024 for full details. 2. Refer to the ASX release dated 2 April 2024 for full details. 3. Associated with the Basin Floor Fan reservoir. Refer to the ASX release dated 6 November 2023 for full details. 5 A B Successful Hickory-1 flow test delivers platform for monetisation of Project Phoenix