Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Empire Energy Group Ltd
|
2024 NAPE Conference Houston Presentation
| Alex Underwood | Page 9 of 11 |
April 27, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"2024 NAPE Conference Houston Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
Empire’s Record Breaking Carpentaria-3H Horizontal Well • Empire’s second horizontal well • Total horizontal lateral length of 2,632m (8,633 ft), with 2,374 m (7,786 ft) successfully placed within the target Velkerri B shale (90% in zone), with strong gas shows throughout the target zone • Confirmed long horizontals can be drilled in the Beetaloo using Australia’s existing rig fleet and generating material cost efficiency gains • Carpentaria-3H successfully stimulated, significantly below budget, executing all planned 40 stages across 1,989m (6,526 ft) • A total of 12.8 million lbs of proppant placed, averaged 319,000 lbs per stage (~2,000 lbs/ft). Comparable to US Shale frac intensity • Carpentaria-3H was brought back online on 3 August 2023 and has demonstrated the material benefits to productivity of soaking, through significantly increased gas flow rates • Following reopening, Carpentaria-3H flowed gas at an average rate of 3.3 mmscf / day (3.8 TJ / day) over the first 30 days (“IP30”) • The Carpentaria-3H “post-soak” average daily production rates have increased 30% over the IP27 “pre-soak” test conducted in Q1 2023 • Empire is investigating optimisation of the per stage performance compared to C- 2H. Evidence of plug failures have likely contributed to materially lower productivity which can be resolved in future wells. Well bore undulation and faulting, may have also contributed to underperformance 8 Carpentaria-3H is the longest horizontal shale well, and the largest frac job ever executed in Australia, on time and ~A$6m under budget Stylised Schematic Vertical Exaggeration 5:1 Without Vertical Exaggeration C-2 Target depth 1,750m (5,250 ft) 2,632m (8,633 ft) Horizontal Section