Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Falcon Oil & Gas Ltd
|
December 2023 Corporate Presentation
| Philip O'Quigley | Page 7 of 11 |
May 09, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"December 2023 Corporate Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
Falcon’s Beetaloo Key Milestones 2011 - 2013 • Entered JV with Hess Corporation • Hess acquired 3,490 km of 2D seismic data, spending A$4million on the permits • Hess exited the Beetaloo and subsequently Australia • Falcon retained 100% of Permits and all seismic data 2014 • Executed ~A$200 million multi-year, multi-well Farm- Out Agreement with Origin Energy Limited for 0% of the working interest in EP6. EP98 and EP11 2018 • Moratorium on hydraulic fracturing lifted 2019 - 2021 • Drilled and fracked Kyalla 11 N2-1H • Farmed down .5% to Origin, and increased Falcon’s carry by A$150 million • Drilled Velkerri-6 (V) • Re-tested Amungee NW-1H, results suggested a normalised gas flow rate of 5.2-5.8 MMscf/d per 1,000m 2015 • Drilled Kalala S-1 (V) and Amungee NW-1H 2016 • Drilled Beetaloo W-1 (V) • Fracked Amungee NW-1H with a Notification of Discovery lodged. • Moratorium on Fracking introduced 201 • 6.6 TCF 2C gross contingent gas resource declared over ~11% of total licence area by Origin 2022 • Bryan Sheffield became a key (9%) shareholder • Origin divested their .5% interest to Tamboran B2 • Falcon earned an additional carry of A$30 million on Origin’s exit • Drilled Amungee NW-2H 2023 • Fracked Amungee NW- 2H • Potential skin damage inhibiting flow of gas • Drilled Shenandoah SS-1H • Drilled Amungee NW-3H • Fracture stimulation of SS1H completed on Dec • Awaiting IP30 flow rates ~A$4m ~A$364m Falcon’s carried spend 2011-2023 2011 to 2014 2015 -201 2018-2021 2022-2023