In Sublette Co., WY, QEP Energy completed two wells in the Lance Formation of the Pinedale Field. The wells had an average IP rate of 5,536 Mcfed. The first well, Stewart Point #6A2-32, was drilled to 14,575 ft MD (14,093 ft TVD) and yielded 4,055 Mcfd and 32 bopd, or 4,247 Mcfed, on a 48/64-inch choke with 975 psi of casing pressure. The second well, Stewart Point #7B3-32, was drilled to 14,489 ft MD......
Provide your credentials to access this page
Member Area: Log in if you have a PLS web account or Sign up for internet access now.