EOG Resources completed its State Magellan #2H Bone Spring well with a 24- hour IP rate of 1,802 bopd and 3,455 Mcfd, or 2,378 boepd (76% oil) in the Sandbar Field in Loving Co., TX. The results were achieved on a 50/64-inch choke with 1,500 psi of casing pressure after being drilled to 15,953 ft MD (10,468 ft TVD). The well was frac'd using 2,186 bbl of acid, 8.1 million lb of proppant and......
Provide your credentials to access this page
Member Area: Log in if you have a PLS web account or Sign up for internet access now.