Close
PLS Home
docFinder
M&A
Help
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Epsilon Energy Ltd.
|
July 2010 Corporate Presentation
| | Page 3 of 11 |
May 22, 2013
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"July 2010 Corporate Presentation"
View Full Document
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
Corporate • TSX – EPS (IPO October 2007) • 13 employees (9 USA, 4 Canada) • www.epsilonenergyltd.com United States Marcellus Shale (Pennsylvania & New York) • 40,500 gross (20,250 net) prospective acres • Joint Venture formed with Chesapeake to develop Pennsylvania Marcellus acreage • Drilling inventory of 320 gross (160 net) horizontal locations • Eight Marcellus wells producing in Highway 706 project in Pennsylvania at a combined rate in excess of 11 Mmcf/d directly into TGP pipeline • Two compressors online; current overall compression capacity 12 Mmcf/d Trenton-Black River (New York) • Conventional structural high risk – high reward targets • Average monthly production 0.5 Mmcf/d Canada Bakken Shale (Oil Play, Saskatchewan) • 63,360 acre AMI with local operator • 39,000 gross (17,640 net) acres leasehold inventory • First well producing 15 bbl/day Utica Shale – TBR – Silurian - Devonian (Quebec) • Elective 25% interest in certain properties owned by Gastem, Inc. (TSXV: GMR.V) – St. Lawrence Lowlands – Yamaska – Utica Project (5% WI) – Gaspe Peninsula • 1,006,000 gross (213,500 net) acres leasehold inventory Ethiopia Federal Democratic Republic of Ethiopia • 100% WI in 19.6 million gross acres (79,345 Km2) onshore – First three year exploration period $3 million – Drill one well and acquire 200 Km2 of 2D seismic – Completed high resolution airborne magnetics and gravity survey – Seeking industry partner 3 Company Overview