Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Cheniere Energy Inc
|
November 2011 Investor Presentation
| Katie Pipkin | Page 20 of 11 |
May 05, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"November 2011 Investor Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
20 0 500 1000 1500 2000Gorgon Gladstone C urtis A ngola Shnov i t Sakh a li n Qa t arga s N i ge ria R a sGa s ELNGT1 Om an A L NGT1 ALNGT1-3 ELNGT1-2Source: ConocoPhillips-Bechtel, Cheniere research. Project costs per ton are total project costs divided by mtpa capacity of L NG trains. Figures do not attempt to isolate, where applicable, the cost of the liquefaction facilities within a major LNG complex. Chart includes a rep resentative sample of liquefaction facilities and does not include all liquefaction facilities existing or under construction. *Before financing costs Note: Past results not a guarantee of future performance.ConocoPhillips-Bechtel trains ** Sabine Pass Liquefaction Project -Brownfield Development, Lower Expected Capital Costs Cost: $/ton Brownfield development 226significant infrastructure already in place226 Storage, marine and pipeline interconnection facilities Upstream wells, gathering pipelines a nd treatment infrastructurenot required226 Pipeline quality natural gas sour ced from U.S. pipeline grid Under construction ** ** Range of liquefaction project costs: $200 -$2,000 per ton 1 Bcf/d of capacity = $1.5 B to $9 B Sabine Pass Liquefaction project estimated to be $4.5B to $5B* for ~1 Bcf/d